1 - 18
1. PREPARATORY PROCEDURES FOR MONITORING
1.3 Option Devices for the Respective Connection
When using the video input unit, RGB input unit, video/RGB input unit, RGB output unit, or
multimedia unit
Install the video input unit, RGB input unit, video/RGB input unit, RGB output unit, or multimedia unit at the 1st stage
of the extension interface. These communication units cannot be used if installed in the 2nd or higher stage.
When any of these units is used, the communication units indicated below must be installed in the 2nd stage of the
extension interface.
Example: When installing a video input unit and a MELSECNET/H communication unit
Model
Communication unit
Bus connection unit
GT15-QBUS2,
GT15-ABUS2
MELSECNET/H communication unit
GT15-J71LP23-25,
GT15-J71BR13
CC-Link IE controller network
communication unit
GT15-J71GP23-SX
CC-Link communication unit
GT15-J61BT13
MELSECNET/H
communication unit
Video/RGB
input unit
Video/RGB
input unit
MELSECNET/H
communication unit
Summary of Contents for GOT2000Series
Page 2: ......
Page 17: ...A 15 REVISIONS WARRANTY...
Page 52: ...1 30 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring...
Page 54: ......
Page 78: ...3 10 3 CONNECTION TO HITACHI PLC 3 6 Device Range that Can Be Set...
Page 100: ...4 22 4 CONNECTION TO FUJI PLC 4 7 Precautions...
Page 174: ...7 24 7 CONNECTION TO YOKOGAWA PLC 7 4 Device Range that Can Be Set...
Page 262: ...9 54 9 CONNECTION TO RKC TEMPERATURE CONTROLLER 9 7 Precautions...
Page 280: ...10 18 10 CONNECTION TO ALLEN BRADLEY PLC 10 4 Device Range that Can Be Set...
Page 296: ...11 16 11 CONNECTION TO GE PLC 11 7 Precautions...
Page 308: ...12 12 12 CONNECTION TO LS INDUSTRIAL SYSTEMS PLC 12 6 Device Range that Can Be Set...
Page 332: ...14 18 14 CONNECTION TO SIEMENS PLC 14 4 Device Range that Can Be Set...
Page 334: ...REVISIONS 2...
Page 337: ......