14. CONNECTION TO SIEMENS PLC
14.3 Ethernet Connection
14 - 9
CONNECTION T
O
SIEME
N
S PLC
14
14.3 Ethernet Connection
14.3.1
System configuration for connecting to SIMATIC S7-300/400 series
(Ethernet connection type: FETCH/WRITE)
*1
The destination connected with the twisted pair cable varies with the configuration of the applicable Ethernet network system.
Connect to the Ethernet module, hub, transceiver or other system equipment corresponding to the applicable Ethernet network
system.
Use cables, connectors, and hubs that meet the IEEE802.3 10BASE-T/100BASE-TX standards.
*2
A length between a hub and a node.
The maximum distance differs depending on the Ethernet device to be used.
The following shows the number of the connectable nodes when a repeater hub is used.
• 10BASE-T: Max. 4 nodes for a cascade connection (500m)
• 100BASE-TX: Max. 2 nodes for a cascade connection (205m)
When switching hubs are used, the cascade connection between the switching hubs has no logical limit for the number of
cascades.
For the limit, contact the switching hub manufacturer.
*3
Product manufactured by Siemens AG. For details of the product, contact Siemens AG.
*4
If the number of GOTs increases, the communication becomes highloaded, and it may affect the communication performance.
SIMATIC
S7-300/400
series
GOT
Connection cable
Ethernet
Module
Communication driver
Ethernet(
SIEMENS S7
), Gateway
PLC
Connection cable
GOT
Number of connectable
equipment
Series
Ethernet
Module
*3
Cable model
*1
Maximum
segment
length
*2
Option device
Model
SIMATIC
S7-300
CP343-1 IT
CP343-1
CP343-1 Lean
CP343-1 Advanced
• 100BASE-TX
Shielded twisted pair cable (STP) or
unshielded twisted pair cable (UTP) of
category 5 or higher
• 10BASE-T
Shielded twisted pair cable (STP) or
unshielded twisted pair cable (UTP) of
category 3 or higher
100m
- (Built into GOT)
When PLC:GOT is N:1
16 PLCs or less for 1 GOT
When PLC:GOT is 1:N
The following shows the
number of GOTs for 1 PLC
32 or less
*4
(recommended
to 16 or less)
SIMATIC
S7-400
CP443-1 IT
CP443-1
Summary of Contents for GOT2000Series
Page 2: ......
Page 17: ...A 15 REVISIONS WARRANTY...
Page 52: ...1 30 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring...
Page 54: ......
Page 78: ...3 10 3 CONNECTION TO HITACHI PLC 3 6 Device Range that Can Be Set...
Page 100: ...4 22 4 CONNECTION TO FUJI PLC 4 7 Precautions...
Page 174: ...7 24 7 CONNECTION TO YOKOGAWA PLC 7 4 Device Range that Can Be Set...
Page 262: ...9 54 9 CONNECTION TO RKC TEMPERATURE CONTROLLER 9 7 Precautions...
Page 280: ...10 18 10 CONNECTION TO ALLEN BRADLEY PLC 10 4 Device Range that Can Be Set...
Page 296: ...11 16 11 CONNECTION TO GE PLC 11 7 Precautions...
Page 308: ...12 12 12 CONNECTION TO LS INDUSTRIAL SYSTEMS PLC 12 6 Device Range that Can Be Set...
Page 332: ...14 18 14 CONNECTION TO SIEMENS PLC 14 4 Device Range that Can Be Set...
Page 334: ...REVISIONS 2...
Page 337: ......