1. PREPARATORY PROCEDURES FOR MONITORING
1.4 Connection Cables for the Respective Connection
1 - 19
1
PREP
ARA
T
OR
Y PROCEDURES FOR MONIT
O
RING
1.4
Connection Cables for the Respective Connection
To connect the GOT to a device in the respective connection type, connection cables between the GOT and a device are
necessary.
For cables needed for each connection, refer to each chapter for connection.
1.4.1
GOT connector specifications
The following shows the connector specifications on the GOT side.
Refer to the following table when preparing connection cables by the user.
RS-232 interface
Use the following as the RS-232 interface and the RS-232 communication unit connector on the GOT. For the GOT
side of the connection cable, use a connector and connector cover applicable to the GOT connector.
(1) Connector specifications
(2) Connector pin arrangement
RS-422/485 interface
Use the following as the RS-422/485 interface and the RS-422/485 communication unit connector on the GOT.
For the GOT side of the connection cable, use a connector and connector cover applicable to the GOT connector.
(1) Connector model
(2) Connector pin arrangement
GOT
Hardware
version*1
Connector type
Connector model
Manufacturer
GT27
GT23
―
9-pin D-sub (male)
inch screw fixed type
17LE-23090-27(D4C
)
DDK Ltd.
GT15-RS2-9P
―
9-pin D-sub (male)
inch screw fixed type
17LE-23090-27(D3CC)
DDK Ltd.
GT01-RS4-M
―
GT27, GT23, GT15-RS2-9P, GT01-RS4-M
GOT
Connector type
Connector model
Manufacturer
GT27
GT23
9-pin D-sub (female)
M2.6 millimeter screw
fixed type
17LE-13090-27(D2AC)
DDK Ltd.
GT15-RS4-9S
9-pin D-sub (female)
M2.6 millimeter screw
fixed type
17LE-13090-27(D3AC)
DDK Ltd.
GT01-RS4-M
GT15-RS4-TE
―
―
SL-SMT3.5/10/90F BOX
9-pin D-sub (male)
GOT main part connector
see from the front
1
5
6
9
GT27, GT23, GT01-RS4-M
9-pin D-sub (female)
GOT main part connector
see from the front
5
1
9
6
Summary of Contents for GOT2000Series
Page 2: ......
Page 17: ...A 15 REVISIONS WARRANTY...
Page 52: ...1 30 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring...
Page 54: ......
Page 78: ...3 10 3 CONNECTION TO HITACHI PLC 3 6 Device Range that Can Be Set...
Page 100: ...4 22 4 CONNECTION TO FUJI PLC 4 7 Precautions...
Page 174: ...7 24 7 CONNECTION TO YOKOGAWA PLC 7 4 Device Range that Can Be Set...
Page 262: ...9 54 9 CONNECTION TO RKC TEMPERATURE CONTROLLER 9 7 Precautions...
Page 280: ...10 18 10 CONNECTION TO ALLEN BRADLEY PLC 10 4 Device Range that Can Be Set...
Page 296: ...11 16 11 CONNECTION TO GE PLC 11 7 Precautions...
Page 308: ...12 12 12 CONNECTION TO LS INDUSTRIAL SYSTEMS PLC 12 6 Device Range that Can Be Set...
Page 332: ...14 18 14 CONNECTION TO SIEMENS PLC 14 4 Device Range that Can Be Set...
Page 334: ...REVISIONS 2...
Page 337: ......