![Mitsubishi GOT2000Series Connection Manual Download Page 90](http://html1.mh-extra.com/html/mitsubishi/got2000series/got2000series_connection-manual_1809187090.webp)
4 - 12
4. CONNECTION TO FUJI PLC
4.3 Connection Diagram
4.3.2
RS-485 cable
(1)
RS-485 connection diagram 1)
*1
Turn ON the terminating switch of a interface converter which will be a terminal.
*2
Set the terminating resistor of GOT side which will be a terminal.
■
Connecting terminating resistors
*3
Connect FG grounding to the appropriate part of a cable shield line.
Precautions when preparing a cable
(2) Cable length
The length of the RS-485 cable must be 500m or less.
(3) GOT side connector
For the GOT side connector, refer to the following.
1.4.1GOT connector specifications
(4) FUJI PLC side connector
Use the connector compatible with the FUJI PLC side
module.
For details, refer to the user's FUJI PLC manual.
Connecting terminating resistors
(1) GOT side
Set the terminating resistor setting switch of the GOT
main unit to "100 OHM".
For the procedure to set the terminating resistor,
referFor the procedure to set the terminating resistor,
refer to the following.
1.4.3Terminating resistors of GOT
(2) FUJI PLC side
When connecting a FUJI PLC to the GOT, a terminating
resistor must be connected.
PLC side
*1
GOT side
*2
RDA
RDB
SDA
SDB
SG
RSA
CSA
RSB
CSB
SDA
SDB
RDA
RDB
SG
FG
SDA
SDB
RDA
RDB
SG
FG
2
7
1
6
5
3
4
8
9
-
PLC side
*1
*3
*3
Summary of Contents for GOT2000Series
Page 2: ......
Page 17: ...A 15 REVISIONS WARRANTY...
Page 52: ...1 30 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring...
Page 54: ......
Page 78: ...3 10 3 CONNECTION TO HITACHI PLC 3 6 Device Range that Can Be Set...
Page 100: ...4 22 4 CONNECTION TO FUJI PLC 4 7 Precautions...
Page 174: ...7 24 7 CONNECTION TO YOKOGAWA PLC 7 4 Device Range that Can Be Set...
Page 262: ...9 54 9 CONNECTION TO RKC TEMPERATURE CONTROLLER 9 7 Precautions...
Page 280: ...10 18 10 CONNECTION TO ALLEN BRADLEY PLC 10 4 Device Range that Can Be Set...
Page 296: ...11 16 11 CONNECTION TO GE PLC 11 7 Precautions...
Page 308: ...12 12 12 CONNECTION TO LS INDUSTRIAL SYSTEMS PLC 12 6 Device Range that Can Be Set...
Page 332: ...14 18 14 CONNECTION TO SIEMENS PLC 14 4 Device Range that Can Be Set...
Page 334: ...REVISIONS 2...
Page 337: ......