2 - 8
2. CONNECTION TO HITACHI IES PLC
2.3 Connection Diagram
Precautions when preparing a cable
(2) Cable length
The length of the RS-422 cable must be 200m or less.
(3) GOT side connector
For the GOT side connector, refer to the following.
1.4.1GOT connector specifications
(4) HITACHI IES PLC side connector
Use the connector compatible with the HITACHI IES
PLC side module.
For details, refer to the HITACHI IES PLC user's
manual.
Connecting terminating resistors
(1) GOT side
Set the terminating resistor setting switch of the GOT
main unit to "Disable".
For the procedure to set the terminating resistor, refer
to the following.
1.4.3Terminating resistors of GOT
(2) HITACHI IES PLC side
When connecting an intelligent serial port module to a
GOT, a terminating resistor has to be connected to the
intelligent serial port module.
HITACHI IES PLC user's Manual
Summary of Contents for GOT2000Series
Page 2: ......
Page 17: ...A 15 REVISIONS WARRANTY...
Page 52: ...1 30 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring...
Page 54: ......
Page 78: ...3 10 3 CONNECTION TO HITACHI PLC 3 6 Device Range that Can Be Set...
Page 100: ...4 22 4 CONNECTION TO FUJI PLC 4 7 Precautions...
Page 174: ...7 24 7 CONNECTION TO YOKOGAWA PLC 7 4 Device Range that Can Be Set...
Page 262: ...9 54 9 CONNECTION TO RKC TEMPERATURE CONTROLLER 9 7 Precautions...
Page 280: ...10 18 10 CONNECTION TO ALLEN BRADLEY PLC 10 4 Device Range that Can Be Set...
Page 296: ...11 16 11 CONNECTION TO GE PLC 11 7 Precautions...
Page 308: ...12 12 12 CONNECTION TO LS INDUSTRIAL SYSTEMS PLC 12 6 Device Range that Can Be Set...
Page 332: ...14 18 14 CONNECTION TO SIEMENS PLC 14 4 Device Range that Can Be Set...
Page 334: ...REVISIONS 2...
Page 337: ......