![Mitsubishi GOT2000Series Connection Manual Download Page 47](http://html1.mh-extra.com/html/mitsubishi/got2000series/got2000series_connection-manual_1809187047.webp)
1. PREPARATORY PROCEDURES FOR MONITORING
1.6 Checking for Normal Monitoring
1 - 25
1
PREP
ARA
T
OR
Y PROCEDURES FOR MONIT
O
RING
Perform an I/O check
Whether the PLC can communicate with the GOT or not can be checked by the I/O check function.
If this check ends successfully, it means correct communication interface settings and proper cable connection.
Display the I/O check screen by Main Menu.
• For GT16
Display the I/O check screen by [Main menu]
[Self check]
[I/O check].
• For GT15, GT14, GT11
Display the I/O check screen by [Main menu]
[Debug & self check]
[Self check]
[I/O check].
For details on the I/O check, refer to the following manual.
GOT2000 Series User's Manual (Utility)
1.
Touch [CPU] on the I/O check screen.
Touching [CPU] executes the communication
check with the connected PLC.
2.
When the communication screen ends
successfully, the screen on the left is displayed.
1.
Summary of Contents for GOT2000Series
Page 2: ......
Page 17: ...A 15 REVISIONS WARRANTY...
Page 52: ...1 30 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring...
Page 54: ......
Page 78: ...3 10 3 CONNECTION TO HITACHI PLC 3 6 Device Range that Can Be Set...
Page 100: ...4 22 4 CONNECTION TO FUJI PLC 4 7 Precautions...
Page 174: ...7 24 7 CONNECTION TO YOKOGAWA PLC 7 4 Device Range that Can Be Set...
Page 262: ...9 54 9 CONNECTION TO RKC TEMPERATURE CONTROLLER 9 7 Precautions...
Page 280: ...10 18 10 CONNECTION TO ALLEN BRADLEY PLC 10 4 Device Range that Can Be Set...
Page 296: ...11 16 11 CONNECTION TO GE PLC 11 7 Precautions...
Page 308: ...12 12 12 CONNECTION TO LS INDUSTRIAL SYSTEMS PLC 12 6 Device Range that Can Be Set...
Page 332: ...14 18 14 CONNECTION TO SIEMENS PLC 14 4 Device Range that Can Be Set...
Page 334: ...REVISIONS 2...
Page 337: ......