[
IX
Troubleshooting ]
- 142 -
HWE10060
GB
*1 Refer to Chapter I [5] Vacuum Drying (Evacuation) for detailed procedure. (page 7)
2
1
2. Check valve Replacement instructions
A
ø
12.7
[
1/2"]
1) Remove the lower service panels.
(Panel FB)
1
B
ø
12.7
[
1/2"]
A
ø
12.7
[
1/2"]
B
ø
12.7
[
1/2"]
2
1. Debraze A-B parts (total 2 places), and remove the Check valve .
2. Replace the Check valve to be serviced while it is removed from the unit.
Precautions for replacing Check valve
·Be sure to perform no-oxidation brazing when brazing.
·Place a wet towel on the Check valve when heating pipes to keep the temperature of the valve from exceeding
120°C [248°F].
·After brazing , check the condition around the brazing. After confirming no leakage, evacuate the air inside. *1
·Perform carefully with the flame direction so that it does not burn cables and plates etc. in the unit.
Check valve
Check valve
Summary of Contents for CAHV-P500YA-HPB
Page 1: ...Service Handbook Service Handbook CAHV P500YA HPB Model 2011 HOT WATER HEAT PUMP ...
Page 7: ...CONTENTS HWE10060 GB ...
Page 9: ... 2 HWE10060 GB ...
Page 19: ... 12 HWE10060 GB ...
Page 37: ... 30 HWE10060 GB ...
Page 46: ... 39 HWE10060 GB IV Remote Controller 1 Using the Remote Controller 41 2 Function Settings 46 ...
Page 47: ... 40 HWE10060 GB ...
Page 55: ... IV Remote Controller 48 HWE10060 GB ...
Page 56: ... 49 HWE10060 GB V Electrical Wiring Diagram 1 Electrical Wiring Diagram 51 ...
Page 57: ... 50 HWE10060 GB ...
Page 61: ... V Electrical Wiring Diagram 54 HWE10060 GB ...
Page 63: ... 56 HWE10060 GB ...
Page 67: ... VI Refrigerant Circuit 60 HWE10060 GB ...
Page 69: ... 62 HWE10060 GB ...
Page 101: ... VII Control 94 HWE10060 GB ...
Page 103: ... 96 HWE10060 GB ...
Page 109: ... VIII Test Run Mode 102 HWE10060 GB ...
Page 111: ... 104 HWE10060 GB ...
Page 155: ... IX Troubleshooting 148 HWE10060 GB ...
Page 156: ... 149 HWE10060 GB X Attachments 1 R407C saturation temperature table 151 ...
Page 157: ... 150 HWE10060 GB ...
Page 159: ... X Attachments 152 HWE10060 GB ...