Power Network Application Trainer
– Earthing / Grounding network impedance measurement
76
Note:
Before, during and after performing tests, follow the instructions for safety work!
Before each measurement check Visual precautions need to be taken before,
during and after performed tests!
Selected measurement methods allow the measurement to be carried out
without
disconnecting
the grounding system (not allowed for the system under operation).
Disconnecting of grounding system on the object under operation is extremely critical
issue, since it could come to serious fault condition during measurements.
Instrument used:
MI 3290 Earth Analyser
MI 3295S Step Contact Voltage Measuring System
MI 3295M
MI 3123
Note:
Take care by using MI 3295S instrument. Connect the current probes according
the instructions in this manual. Wrong connection of current probes could
damage the module or burn the fuse.
Explanation of switch positions (example):
For more details, please check Item 1.8.1.
Table 12-2: Exercises
– Earth resistance measurements
E
xe
rci
s
e
E
xe
rci
se
n
u
mb
er
Sw
itc
h
Pos
iti
on
s
Method used
Condition Simulation /
Measuring instrument
Expected result
P
ylon
e
ar
th
res
istan
ce
measur
ement
Item 4.1.1
Regular measurement place
condition (simulated resistive earth
character), single frequency
measurement for 3P method
MI 3290:
3 Pole measurement method:
Ze = 2,56 Ω @ 329 Hz, single mode
Summary of Contents for MI 3298
Page 55: ...Power Network Application Trainer Earthing Grounding network impedance measurement 55 ...
Page 56: ...Power Network Application Trainer Earthing Grounding network impedance measurement 56 ...
Page 124: ...Power Network Application Trainer Earthing Grounding network impedance measurement 124 ...
Page 228: ...MI 3290 Earth Analyser 228 ...
Page 229: ...MI 3280 Digital Transformer Analyser 229 ...
Page 230: ...MI 3280 Digital Transformer Analyser 230 ...
Page 231: ...MI 3250 MicroOhm 10A 231 ...
Page 232: ...MI 3205 TeraOhmXA 5kV 232 ...