Power Network Application Trainer
– Insulation Analysis
195
The total current I
tot
comprises of four partial currents.
I
tot
Total current
I
Riss
Surface leakage current
I
Riso
Insulation leakage current
I
RCpi
Polarization absorption current
I
Ciso
Capacitance charging current
Table 65-3: The four partial currents table
Figure 107-3: Typical current / time diagram for a real voltage source
In practice the insulation resistance measurement instrument does not include an
ideal voltage source. At the start all available instrument power is used to charge the
capacitor C
iso
for a short period. The voltage on connection points drops because of
this.
Figure 108-3: Current diagram for an ideal voltage source
When DC voltage is suddenly applied to the insulation, the test current will start at a
high value, gradually decrease with time, and finally level off to a stable value. The
leakage current does not change with time, and this current is the primary factor on
which the insulation quality may be judged.
Summary of Contents for MI 3298
Page 55: ...Power Network Application Trainer Earthing Grounding network impedance measurement 55 ...
Page 56: ...Power Network Application Trainer Earthing Grounding network impedance measurement 56 ...
Page 124: ...Power Network Application Trainer Earthing Grounding network impedance measurement 124 ...
Page 228: ...MI 3290 Earth Analyser 228 ...
Page 229: ...MI 3280 Digital Transformer Analyser 229 ...
Page 230: ...MI 3280 Digital Transformer Analyser 230 ...
Page 231: ...MI 3250 MicroOhm 10A 231 ...
Page 232: ...MI 3205 TeraOhmXA 5kV 232 ...