Power Network Application Trainer
– Earthing / Grounding network impedance measurement
63
Figure 44-2: Substitute circuit for Passive (Flex Clamps) measurement
Notes:
Inductive current I
gw
flows into earth through Z
sel1/1
, Z
sel2/1
, Z
sel1/2
and Z
sel2/2
The voltage drop is measured by auxiliary potential probe (S).
The selective currents I
f1-4
is measured through the earthing electrode Zsel
1-4/1
(pylon foots) selected by the user.
The selected earth impedance Z
sel1-4/1
is determined from the voltage U
S
–E
and
selected current (external current clamp
– I
f1-4
) ratio.
When using only one, two or three flex clamps, always connect one clamp to F1
terminal (synchronization port).
Make sure that the arrow marked on the clamp coupling points toward the correct
orientation for correct phase measurement.
Make sure that the number of turns is correctly entered in the test parameters
window
Summary of Contents for MI 3298
Page 55: ...Power Network Application Trainer Earthing Grounding network impedance measurement 55 ...
Page 56: ...Power Network Application Trainer Earthing Grounding network impedance measurement 56 ...
Page 124: ...Power Network Application Trainer Earthing Grounding network impedance measurement 124 ...
Page 228: ...MI 3290 Earth Analyser 228 ...
Page 229: ...MI 3280 Digital Transformer Analyser 229 ...
Page 230: ...MI 3280 Digital Transformer Analyser 230 ...
Page 231: ...MI 3250 MicroOhm 10A 231 ...
Page 232: ...MI 3205 TeraOhmXA 5kV 232 ...