![METREL MI 3298 Instruction Manual With Exercises Download Page 185](http://html1.mh-extra.com/html/metrel/mi-3298/mi-3298_instruction-manual-with-exercises_1778927185.webp)
Power Network Application Trainer
– Power generator, transformer, coils
185
3. Take care that entered data corresponds to the transformer nominal data.
These data are presented on the transformer nominal plate. Select the proper:
- Vector group
Note: In case of wrong selected vector group, the measurement result could be
incorrect.
Start the measurement by pressing START key
on the instrument or icon
on the LCD.
Expected result:
Winding resistance measurement does not have any limit specification, so there is no
FAIL/PASS indication.
Metrel recommends to perform regularly measurements on the transformer and
monitor eventuel deviations.
Exercise 2:
Same connection and configuration setup as in previous exercise, with simulated
error - switch on position 2.
Method used
Simulated condition
Expected result
RH
A
= 401,3
Ω RX
A
=2.376
Ω
RH
B
= 400.7
Ω RX
B
=4.462
Ω
RH
C
= 405,1
Ω RX
C
>999.9
Ω
Table 60-3: Winding resistance measuring setup/result presentation with simulated error
Summary of Contents for MI 3298
Page 55: ...Power Network Application Trainer Earthing Grounding network impedance measurement 55 ...
Page 56: ...Power Network Application Trainer Earthing Grounding network impedance measurement 56 ...
Page 124: ...Power Network Application Trainer Earthing Grounding network impedance measurement 124 ...
Page 228: ...MI 3290 Earth Analyser 228 ...
Page 229: ...MI 3280 Digital Transformer Analyser 229 ...
Page 230: ...MI 3280 Digital Transformer Analyser 230 ...
Page 231: ...MI 3250 MicroOhm 10A 231 ...
Page 232: ...MI 3205 TeraOhmXA 5kV 232 ...