![METREL MI 3298 Instruction Manual With Exercises Download Page 25](http://html1.mh-extra.com/html/metrel/mi-3298/mi-3298_instruction-manual-with-exercises_1778927025.webp)
Power Network Application Trainer Introduction
MI 3298
25
1.8.3 MI 3298 T: Power Transformer, Cables and Power Loads
MI 3298 T main parts:
Figure 16-
1: MI 3298 T “puzzle” training module
List of main elements:
1. Transformer connection terminals and its technical data
Voltage ratio: 10075 V / 1000 V
Vector group: Yyn0
Note: For measuring the transformer isolation use max. test voltage
1kV!
2. Test point for cable insulation resistance testing.
Max. test voltage 5 kV DC!
3. Tube Fuse 250V T1A
4. Switch for selecting different transformer winding conditions
5. Ground terminal
6. Connection for the next (neighbourhood) training module (puzzle concept)
Summary of Contents for MI 3298
Page 55: ...Power Network Application Trainer Earthing Grounding network impedance measurement 55 ...
Page 56: ...Power Network Application Trainer Earthing Grounding network impedance measurement 56 ...
Page 124: ...Power Network Application Trainer Earthing Grounding network impedance measurement 124 ...
Page 228: ...MI 3290 Earth Analyser 228 ...
Page 229: ...MI 3280 Digital Transformer Analyser 229 ...
Page 230: ...MI 3280 Digital Transformer Analyser 230 ...
Page 231: ...MI 3250 MicroOhm 10A 231 ...
Page 232: ...MI 3205 TeraOhmXA 5kV 232 ...