Functional Description with Process Diagrams
5.2.6
Valve Leakage Test
NOTICE
The gas pressure test switch and design and volume of the test section pipework must be set
and designed such that the valve test system reliably detects even the smallest gas leakage
by the valve testing system at maximum combustion thermal output.
EN1648 requires a minimum gas leakage of 0.1% volume in relation to the gas flow rate at
maximum combustion thermal output, but at least 50 dm
3
/hr.
5.2.6.1 Requirements
NOTICE
The function must be mapped.
The pressure switch between the 2 main valves must be mapped either for valve leakage test
or gas pressure min. and valve leakage test.
5.2.6.2 Required Parameters
P no.
Description
Attributes
311
Valve leakage test before burner start-up [0.1
s]
V1.0.0.0
Configured duration of the valve leakage test in 0.1
s
Write:
1/GUI/UI
Read: 0
Default: 200
Min.: 50
Max.: 9999
313
Fill time of the valve leakage test [0.1
s]
V1.0.0.0
Fill time of the valve leakage test in 0.1
s
Write:
4/GUI/UI
Read: 0
Default: 20
Min.: 20
Max.: 50
334
Block and bleed time of valve leakage test line [0.1
s]
V1.0.0.0
Time in 0.1 s for which the gas valve 2 is opened for block and bleed of the valve leakage
test line.
Write: 0/GUI/UI
Read: 0
Default: 10
Min.: 0
Max.: 25
802
Type of valve leakage test (0–none; 1–together with pre-purge; 2–after pre-purge is com-
pleted; 4–after burner operation; 5–before operation together with the pre-purge; 6–before
operation after pre-purge is completed)
V1.0.0.0
Type of valve leakage test:
0: no valve leakage test
1: valve leakage test starts together with the pre-purge
2: valve leakage test starts after pre-purge is completed
4: valve leakage test after burner operation
5: valve leakage test before operation starts together with pre-purge and after burner
operation
6: valve leakage test before operation starts after pre-purge is completed and after burner
operation
Write: 1/GUI/UI
Read: 0
Default: 0,1,0,0
Min.: 0
Max.: 7
Summary of Contents for CMS
Page 2: ......
Page 131: ...130 7 Operating Control and Displays 7 1 5 5 Deleting Curves Delete firing rate curve...
Page 148: ...147 7 Operating Control and Displays Channel configuration AL1 Fig 7 18 Channel configuration...
Page 157: ...156 7 Operating Control and Displays Fig 7 27 System CRCs menu...
Page 162: ...161 7 Operating Control and Displays Fig 7 32 IP setting menu...
Page 166: ...165 7 Operating Control and Displays Fig 7 35 Installation...
Page 167: ...166 7 Operating Control and Displays Fig 7 36 Installation...
Page 176: ...175 7 Operating Control and Displays Fig 7 49 Loading a protected dataset into the device...
Page 202: ...201 7 Operating Control and Displays Replacing a Module Fig 7 81 Module replacement menu...
Page 276: ...275 10 Maintenance 3 Restart CMS to complete the update...
Page 282: ...281 12 Appendix 12 5 EU Declaration of Conformity...
Page 283: ...282 12 Appendix...