Investigation Procedure
Solar Blue User Manual
23
2.4
Start the Measurement Program
In the database program, click the
New investigation
button to start the
measurement program. When more than one system is installed, you need to
select the stationary measurement system.
Figure 2.7
Measurement program
—select a new investigation
The measurement program shows all available investigations. Select the
appropriate investigation protocol and then click the investigation name to start
the pre-test of the selected investigation.
2.5
Prepare the Investigation (Pre-Test)
2.5.1
Consumables Traceability
Introduction
Solar Blue uses
Consumables Traceability
to track consumables used during
studies. When the pre-test is started, the
Consumables traceability
dialog
will open.