
Maintenance
16
Maintenance table
16.1
Comprima V 180
Original Operating Instructions 150001053_00_en
161
16.1.2
Maintenance – once after 10 hours
Components
Retighten wheel nuts
Tighten the screw connections on the drawbar
Check tyre pressure
Have the slack adjuster of the brake system
checked by KRONE service partners
Check the hydraulic hoses for leaks and, if ne-
cessary, have them replaced by a KRONE
service partner.
Clean the bushing and the drawbar eye
Check rear bale formation conveyor and ad-
just if required
16.1.3
Maintenance – once after 50 hours
Changing oil
Main gearbox
16.1.4
Maintenance – Once after 500 round bales
Components
16.1.5
Maintenance – every 10 hours, at least daily
Checking oil level
Main gearbox
Components
Clean the machine
Check that the brake system functions
Clean the bushing and the drawbar eye
Check dosing units of the central chain lubric-
ation system and clean if required
16.1.6
Maintenance – every 50 hours
Components
Tighten screws/nuts on the machine
Tighten the screw connections on the drawbar
Retighten wheel nuts
Check tyre pressure
Drain condensation water out of the com-
pressed air tank