![Krone Big Pack 1270 XC Original Operating Instructions Download Page 78](http://html1.mh-extra.com/html/krone/big-pack-1270-xc/big-pack-1270-xc_original-operating-instructions_2004793078.webp)
7
Initial operation
7.5
Adjusting universal shaft (for the version with “PreChop”)
78
BiG Pack 1270 XC
Original Operating Instructions 150000748_01_en
Mounting inner guard tube
1
2
3
4
5
BP000-402
Slide the inner guard tube (1) on the outer section tube (3) and align so that the opening (5)
of the cap (2) and the slide ring lock (4) are in alignment.
Slide on the inner guard tube (1) until the slide ring lock (4) engages audibly in the opening
(5).
Drilling lubrication borehole into outer guard tube
X
X
1
2
3
4
BP000-405
Bring the machine into the widest position (straight-ahead driving).
Shut down and safeguard the machine,
.
In order to determine dimension X, measure the distance between the centre of the annular
groove (1) (tractor PTO shaft) and the centre of the annular groove (2) (machine PTO shaft).
Lay the universal shaft half (3) and the inner guard tube (4) next to each other so that the
determined dimension X is reached.
Mark the position of the lubrication borehole of the inner guard tube (4) on the outer guard
tube (3).
Dismount the outer guard tube (3),
.
Drill three boreholes of Ø 25 mm into the outer guard tube (3), file them to an oblong hole
and deburr.
Mount the outer guard tube (3),