![Krone Big Pack 1270 XC Original Operating Instructions Download Page 79](http://html1.mh-extra.com/html/krone/big-pack-1270-xc/big-pack-1270-xc_original-operating-instructions_2004793079.webp)
Initial operation
7
Adjusting universal shaft (for the version with “PreChop”)
7.5
BiG Pack 1270 XC
Original Operating Instructions 150000748_01_en
79
Mounting protective cap
1
2
3
BP000-406
Slide on the protective cap (2) and align it so that the both openings (1) are in alignment with
the slide ring locks (3).
Slide on the protective cap (2) until both slide ring locks (3) engage audibly in the openings
(1).
Determining displacement path (overlap)
X
Y
1
2
3
4
5
1
4
6
7
8
BP000-404
Position the universal shaft halves (1, 4) so that the outer section tube (3) is located in front
of the inner section tube (2).
Determine dimension “X”.
Assemble the universal shaft halves (1, 4) until the stop is reached.
At the end of the outer guard tube, draw a marking (5) on the inner guard tube.
In order to facilitate the assembly of the universal shaft half (4), push back the protective cap
(6),
.
Slide the universal shaft half (1) on the tractor PTO shaft until the lock snaps into place
automatically.
Dismount the clamping bridge (7).
Slide the universal shaft half (4) on the machine PTO shaft until the boreholes of the
clamping bridge (7) protrude beyond the annular groove.
Mount the clamping bridge (7) by means of the screws (8). Tightening torque: M12=80 Nm,
M14=130 Nm, M16= 200 Nm.
Bring the machine into the widest position (straight-ahead driving).
Shut down and safeguard the machine,
.
Determine the dimension Y.