![Krone Big Pack 1270 XC Original Operating Instructions Download Page 65](http://html1.mh-extra.com/html/krone/big-pack-1270-xc/big-pack-1270-xc_original-operating-instructions_2004793065.webp)
Initial operation
7
Attaching the hydraulic support jack
7.1
BiG Pack 1270 XC
Original Operating Instructions 150000748_01_en
65
7
Initial operation
WARNING
Risk of injury or damage to the machine due to faulty initial operation
If the initial operation is carried out incorrectly or incompletely, the machine may present
defects. As a result, people may be injured or killed or the machine may be damaged.
Initial operation must only be carried out by authorised technicians.
Read in full and observe the “Personnel qualification of technicians”,
.
WARNING
Risk of injury due to non-observance of relevant safety instructions
If the relevant safety instructions are not observed, persons may be seriously injured or killed.
To avoid accidents, the relevant safety instructions must be read and observed,
WARNING
Risk of injury due to non-observance of safety instructions
If the relevant safety routines are not observed, persons may be seriously injured or killed.
The safety routines must be read and observed to avoid accidents,
.
7.1
Attaching the hydraulic support jack
For the “hydraulic support jack” version
BP000-081
ü
The machine is shut down and safeguarded,
.
Attach a suitable hoist at the attachment point (2) of the drawbar.
In order to raise the support jack (4), slightly lift the drawbar by means of a hoist, shift
support jack entirely upward and secure with socket pin (5).
Place sufficiently dimensioned square blocks under the front drawbar beam (3).
Lower the drawbar by means of the hoist.
Lay the hydraulic hoses (1) to the outside.
In order to remove the support jack (4), screw out the 4 screws (6), remove the support jack
and put it down to the side.