Chapter 3 Troubleshooting
3-26
3.2.15 14000 ~ 15000: Signal Process Errors
References for response method
•
See
"2.5.5 Optical Unit/Eraser Unit (Page 2-15)"
for the position of the LMC.
•
See
"3.2.20 Confirm the LMC Operation (Page 3-31)"
for the procedure to confirm the LMC.
•
See
"5.10.3 Replacing the CF Card (Page 5-118)"
for the procedure to replace the CF card.
Error
code
Description of the error
Response
(References to replacement methods are listed at the end
of the table.)
14000
Signal process error
−
Gain Overflow
Gain value has overflowed in
the gain/offset compensation
process during the PowerON/
Wakeup.
Confirm the operation of the LMC with standard current
read if it recur.
14001
Signal process error
−
Gain Underflow
Gain value has underflowed in
the gain/offset compensation
process during the PowerON/
Wakeup.
14002
Signal process error
−
Offset Overflow
Offset value has overflowed in
the gain/offset compensation
process during the PowerON/
Wakeup.
14003
Signal process error
−
Offset Underflow
Offset value has underflowed in
the gain/offset compensation
process during the PowerON/
Wakeup.
14010
Signal process error
−
QRV Overflow
PMT high voltage setup value
has exceeded the operation
guarantee voltage during the
sensitivity calibration.
Confirm the following when it recur.
1. Confirm that there is no mistake in exposure X-ray
condition and the service tool input dosage. (There is a
possibility that the exposure dosage is too small)
2. Replace the cassette and confirm the operation.
3. Confirm the connectors around the PMT and the LMC.
14011
Signal process error
−
QRV Underflow
PMT high voltage setup value is
lower than the operation
guarantee voltage during the
sensitivity calibration.
Confirm the following when it recur.
1. Confirm that the high voltage ON/OFF switch is ON on
the LMC. (It is ON if the image is displayed on the
console upon reading any image)
2. Confirm that there is no mistake in exposure X-ray
condition and the service tool input dosage. (There is a
possibility that the exposure dosage is too large)
3. Replace the cassette and confirm the operation.
4. Confirm the connectors around the PMU and the LMC.
Summary of Contents for 0902
Page 2: ......
Page 6: ......
Page 12: ......
Page 30: ...2 10...
Page 54: ......
Page 84: ...Chapter 3 Troubleshooting 3 30 3 2 19 Confirm the H sync Signal To be stated...
Page 85: ...Chapter 3 Troubleshooting 3 31 3 2 20 Confirm the LMC Operation To be stated...
Page 120: ......
Page 296: ...8 10...
Page 300: ......
Page 301: ......