Verification Test Setups
Refer to
for the equipment required for verification. Refer to the
section for information about setting up the voltmeter, connecting
the current shunt, and connecting the electronic load.
Test each output channel individually. Refer to the appropriate
form for the instrument
settings of the power module you are checking. For optimum performance, all verification and
calibration procedures should comply with the following recommendations:
l
Ambient temperature is stable, at 23°C ±5°C.
l
Ambient relative humidity is less than 70%.
l
30 minute warm-up period before verification or adjustment.
l
Cables as short as possible, twisted or shielded to reduce noise and inductance.
l
Load lead lengths for models N678xA SMU must be between 1 and 4 feet.
The following figures show the verification test set-ups. Connect all leads to the output terminals as
shown in the figure.
Keysight N6705C Operating and Service Guide
375
8 Verification and Calibration
Summary of Contents for N6705C
Page 76: ......
Page 353: ...Status Diagram Keysight N6705C Operating and Service Guide 353 7 SCPI Programming Reference ...
Page 376: ...8 Verification and Calibration 376 Keysight N6705C Operating and Service Guide ...
Page 389: ...Keysight N6705C Operating and Service Guide 389 8 Verification and Calibration ...
Page 434: ......
Page 438: ...9 Service and Maintenance 438 Keysight N6705C Operating and Service Guide ...
Page 460: ...9 Service and Maintenance 460 Keysight N6705C Operating and Service Guide ...
Page 461: ...Keysight N6705C Operating and Service Guide 461 9 Service and Maintenance ...
Page 462: ...9 Service and Maintenance 462 Keysight N6705C Operating and Service Guide ...
Page 463: ...Keysight N6705C Operating and Service Guide 463 9 Service and Maintenance ...
Page 470: ...Mezzanine Parts 9 Service and Maintenance 470 Keysight N6705C Operating and Service Guide ...
Page 471: ...Front Panel Parts Keysight N6705C Operating and Service Guide 471 9 Service and Maintenance ...
Page 476: ......