36
Getting Started
Returning the Instrument for Service
ed cardboard carton of 159 kg (350 lb) test strength.
• The carton must be large enough to allow approximately 7 cm (3 inches) on all
sides of the instrument for packing material, and strong enough to accommodate
the weight of the instrument.
• Surround the equipment with approximately 7 cm (3 inches) of packing material,
to protect the instrument and prevent it from moving in the carton. If packing foam
is not available, the best alternative is S.D-240 Air Cap™ from Sealed Air Corpo-
ration (Commerce, California 90001). Air Cap looks like a plastic sheet filled with
air bubbles. Use the pink (antistatic) Air Cap™ to reduce static electricity. Wrap-
ping the instrument several times in this material will protect the instrument and
prevent it from moving in the carton.
4
Seal the carton with strong nylon adhesive tape.
5
Mark the carton “FRAGILE, HANDLE WITH CARE”.
6
Retain copies of all shipping papers.
Summary of Contents for 86120B
Page 1: ...Keysight 86120B Multi Wavelength Meter User s Guide...
Page 2: ......
Page 3: ...1...
Page 12: ...10 General Safety Considerations...
Page 68: ...You can use the ABORT and CONT softkey to stop and restart a print job that is in progress...
Page 100: ...98 Programming Monitoring the Instrument...
Page 231: ...229 Performance Tests Test 5 Amplitude Accuracy and Linearity...
Page 232: ......
Page 244: ...242 Specifications and Regulatory Information Product Overview...
Page 250: ...248 Reference Menu Maps Display List by Power Menu Display List by WL Menu...
Page 251: ...249 Reference Menu Maps Delta On Menu Delta Off Menu...
Page 253: ...251 Reference Menu Maps System Print Menu...
Page 254: ...252 Reference Menu Maps System Setup Menu...
Page 272: ......