SAN32M1 Fabric Switch Installation and Service Manual
228
Figure 129
Shut down windows dialog box
b. Select the Shut Down option from the list box and click OK. The
EFC Server powers down.
c. Wait approximately 30 seconds and press the power button on
the LCD panel to power on the server and perform POSTs.
During POSTs:
1. The green LCD panel illuminates.
2. The green HDD LED blinks momentarily, and processor
speed and random-access memory information display
momentarily at the LCD panel.
3. After a few seconds, the LCD panel displays the following
message pertaining to boot sequence selection (
Figure 130
):
Figure 130
LCD panel during boot sequence
4. Ignore the message. After ten seconds, the server performs
the boot sequence from the BIOS. During the boot sequence,
the server performs additional POSTs and displays the
following operational information at the LCD panel:
•
Host name.
•
System date and time.
•
LAN 1 and LAN 2 IP addresses.
i24M1061
Boot from LAN?
Press <Enter>
Summary of Contents for SAN32M1
Page 1: ...IBM TotalStorage SAN32M1 Switch Installation and Service Manual GC26 7665 01...
Page 2: ......
Page 3: ...IBM TotalStorage SAN32M1 Switch Installation and Service Manual GC26 7665 01...
Page 12: ...SAN32M1 Fabric Switch Installation and Service Manual x...
Page 18: ...SAN32M1 Fabric Switch Installation and Service Manual xvi...
Page 20: ...SAN32M1 Fabric Switch Installation and Service Manual xviii...
Page 82: ...SAN32M1 Fabric Switch Installation and Service Manual 50...
Page 222: ...SAN32M1 Fabric Switch Installation and Service Manual 190...
Page 418: ...SAN32M1 Fabric Switch Installation and Service Manual 386...
Page 454: ...SAN32M1 Fabric Switch Installation and Service Manual 422...
Page 532: ...SAN32M1 Fabric Switch Installation and Service Manual 500...
Page 536: ...SAN32M1 Fabric Switch Installation and Service Manual 504...
Page 625: ......
Page 626: ...Printed in USA GC26 7665 01...