256
Touring Many Sites
Changing the Time Spent at a Site During a Tour
1.
Using Admin, click the Tours tab.
2.
To display the Update Tour dialog box, do one of the following:
•
Double-click the name of the tour that you want to customize.
- or -
•
Select the tour that you want to customize, then either: click
on the toolbar,
Update in the Actions menu, or press the F12 key.
Figure 13-3
Customizing the Duration of a Multi-Media Unit in a Tour
3.
In the Add/Update Tour dialog box, do one of the following:
•
Select a site, then click
.
- or -
•
Double-click the name of a site.
4.
In the Duration field, you can adjust the minutes or seconds to change the time spent
at the site, as needed (see
).
5.
Click Save and Close.
TIP!
Should you plan to view a site for long periods, say thirty minutes or more, consider
using a Live Session instead of changing the durations of time spent at each site.
Selecting Another Connection to a Site During a Tour
1.
Using Admin, click the Tours tab.
2.
To display the Update Tour dialog box. Double-click the name of the tour you need to
customize.
3.
Double-click the name of a site.
4.
Click the drop-down arrow next to the Connection box. There may only be one
connection to select. Connections are defined while adding or updating a site. See
Connecting to a Rapid Eye Unit
.
5.
Select a connection type used for the site during the tour.
Summary of Contents for Rapid Eye
Page 2: ......
Page 3: ...System Administrator Guide ...
Page 22: ...22 ...
Page 94: ...94 Video Feed Setup ...
Page 114: ...114 Pan Tilt and Zoom PTZ Setup ...
Page 258: ...258 Touring Many Sites ...
Page 280: ...280 End User License Agreement ...
Page 292: ...292 ...
Page 293: ......