4. Install EPM or CPM as required.
l
Install EPM:
a. Set the EPM address and network topology for the I/O rack
using the rotary switches, as shown below.
TIP:
Set the 10x and 1x switches to the two digit
address ranging from 01 to 99. The lower switch (10x)
is used to set the tens digit and the upper switch (1x)
sets the ones digit. A small slotted screwdriver works
well; avoid pencils. Set the network topology using the
100x switch. 3 is for Ring network topology and 4 is for
Star network topology.
b. Insert EPM to the right of the power supply, and secure it in
place with the two captured screws in the faceplate, as shown
below.
74
Summary of Contents for ControlEdge 900 platform
Page 6: ...6 Contents ...
Page 12: ...12 Chapter 1 About this guide ...
Page 52: ...52 ...
Page 57: ...57 One Slot Rack 1 CPM 1 EPM 1 P S 1 RM ...
Page 59: ...59 One Slot Rack ...
Page 62: ...Figure 5 7 Rack dimensions with redundant power supply 62 ...
Page 75: ...75 c Insert the Ethernet cables and mount the security cover for the EMP ...
Page 76: ...d Optional mount a wire security seal The user should get a wire security seal themselves 76 ...
Page 124: ...Figure 5 31 Universal Analog Input Wiring Figure 5 32 Examples of RTD Input Wiring 124 ...
Page 137: ...137 Figure 5 47 Pulse Outing Wiring Figure 5 48 Frequency Wiring ...
Page 144: ...Figure 5 57 16 point High Level Analog Input Wiring 144 ...
Page 147: ...147 Figure 5 60 AC DC Isolated Input Module Wiring ...
Page 148: ...148 ...
Page 168: ...168 ...
Page 178: ...178 Chapter 8 Diagnostics and Troubleshooting ...
Page 222: ...Appendix A Installing RTP 222 ...
Page 227: ...Appendix A Installing RTP Relay Output RTP Internal schematic 227 ...