67
Dimensions and drill patterns are shown here:
b. Drill and tap for # 10 (or M4) screws.
c. Start the mounting screws (supplied by the user) in the drilled
holes.
d. Hang the Rack on the screws at the top.
e. Mark the locations for the bottom screws.
f. Drill and tap for # 10 (or M4) screws.
g. Remove the rack from the enclosure.
2. Aluminum grounding bars for the I/O module wiring are optional.
They can be mounted at the top, at the bottom, or at the top and
bottom of the rack, as indicated below. If grounding bars are
Summary of Contents for ControlEdge 900 platform
Page 6: ...6 Contents ...
Page 12: ...12 Chapter 1 About this guide ...
Page 52: ...52 ...
Page 57: ...57 One Slot Rack 1 CPM 1 EPM 1 P S 1 RM ...
Page 59: ...59 One Slot Rack ...
Page 62: ...Figure 5 7 Rack dimensions with redundant power supply 62 ...
Page 75: ...75 c Insert the Ethernet cables and mount the security cover for the EMP ...
Page 76: ...d Optional mount a wire security seal The user should get a wire security seal themselves 76 ...
Page 124: ...Figure 5 31 Universal Analog Input Wiring Figure 5 32 Examples of RTD Input Wiring 124 ...
Page 137: ...137 Figure 5 47 Pulse Outing Wiring Figure 5 48 Frequency Wiring ...
Page 144: ...Figure 5 57 16 point High Level Analog Input Wiring 144 ...
Page 147: ...147 Figure 5 60 AC DC Isolated Input Module Wiring ...
Page 148: ...148 ...
Page 168: ...168 ...
Page 178: ...178 Chapter 8 Diagnostics and Troubleshooting ...
Page 222: ...Appendix A Installing RTP 222 ...
Page 227: ...Appendix A Installing RTP Relay Output RTP Internal schematic 227 ...