It is recommended to bring the process to a safe and orderly
shutdown.
You will need a #2 Phillips screwdriver.
To replace a non-redundant or unsynchronized primary PLC-CPM
1. If a process is currently in operation, bring it to the safe mode, and
orderly shutdown if it is required.
2. Using an external (user-supplied) switch, disconnect the power
supply in the rack (associated with the CPM to be replaced) from
the source main power.
3. Observe where communications cables are plugged into the CPM,
and if necessary, tag them to identify their functions. Unplug all
communications cables.
4. At the top and bottom of the module, loosen the captured screws
that secure the module in the rack, and remove the CPM from the
rack. (Note that an up/down rocking motion helps with removal of
the module.)
5. Ensure that the new CPM is properly aligned with the slot guides,
insert the new CPM in the rack, and secure it in place with the
captured screws at top and bottom of the module.
6. Re-install communications cables.
7. Set the new CPM’s mode switch position to STOP (to prevent an
old/stale configuration from running and to enable firmware
update and configuration load).
8. Using the (user-supplied) switch, re-connect power supply in the
rack (associated with the new CPM) the source main power to the
rack.
9. Optional-for IPsec enable system, if Secure Communication is
enabled in the system, disable the IPsec in the PC installed the
ControlEdge Builder. See "Disable IPsec policy on PCs" in
ControlEdge PLC and ControlEdge RTU Network and Security
Guide
for more information.
10. Use the ControlEdge Builder to load firmware to the new CPM to
match the version that was running in the removed CPM.
11. Use the ControlEdge Builder to download the configuration to the
new CPM.
12. Set the new CPM’s mode switch position to the desired operation
state.
13. Optional-for IPsec enable system, setup certificates and IPsec
policy in the CPM. See "Setup certificates and IPsec policy in
28
Summary of Contents for ControlEdge 900 platform
Page 6: ...6 Contents ...
Page 12: ...12 Chapter 1 About this guide ...
Page 52: ...52 ...
Page 57: ...57 One Slot Rack 1 CPM 1 EPM 1 P S 1 RM ...
Page 59: ...59 One Slot Rack ...
Page 62: ...Figure 5 7 Rack dimensions with redundant power supply 62 ...
Page 75: ...75 c Insert the Ethernet cables and mount the security cover for the EMP ...
Page 76: ...d Optional mount a wire security seal The user should get a wire security seal themselves 76 ...
Page 124: ...Figure 5 31 Universal Analog Input Wiring Figure 5 32 Examples of RTD Input Wiring 124 ...
Page 137: ...137 Figure 5 47 Pulse Outing Wiring Figure 5 48 Frequency Wiring ...
Page 144: ...Figure 5 57 16 point High Level Analog Input Wiring 144 ...
Page 147: ...147 Figure 5 60 AC DC Isolated Input Module Wiring ...
Page 148: ...148 ...
Page 168: ...168 ...
Page 178: ...178 Chapter 8 Diagnostics and Troubleshooting ...
Page 222: ...Appendix A Installing RTP 222 ...
Page 227: ...Appendix A Installing RTP Relay Output RTP Internal schematic 227 ...