-146-
ENGINE
- 146 -
STARTER MOTOR AND WATER PUMP
No.
Part Name
Qty
Remarks
Removing the starter motor and water
pump
Remove the parts in the order listed
1
Needle pin HK1010
1
2
Water pump driven gear
1
3
Water pump shaft
1
4
Bearing 6000
1
5
Oil seal 10×20×5
2
6
Water pump bearing soleplate
1
7
O-ring 38.5×2.5
2
8
Water pump vane
1
9
Shift arm components
1
10
Pair gearwheel shaft
1
11
Pair gearwheel
1
12
Start motor
1
ENGINE
- 147 -
No.
Part Name
Qty
Remarks
13
Tensioner plate assy
1
14
Timing chain 102
1
15
Guide plate
1
16
Tensioner gasket
1
17
Tensioner assy
1
18
Flange bolt M6×16
2
For assembly, reverse the disassembly
procedure.
Summary of Contents for HS200UTV
Page 3: ......
Page 15: ......
Page 94: ... 79 SPECIFICATIONS 79 HYDROGRAPHIC CHART Hydrographic chart Pressure ...
Page 95: ... 80 SPECIFICATIONS 80 LUBRICATION OIL WAY LUBRICATION OIL WAY Pressure splashing oil ...
Page 248: ... 233 CHASSIS 233 Fuel tank cap Remove the fuel tank cap by turning it counterclockwise ...
Page 263: ... 248 ...
Page 304: ... 289 ...
Page 305: ... 290 ...
Page 306: ... 291 ...
Page 307: ... 292 ...
Page 308: ... 293 ...
Page 309: ... 294 ...
Page 310: ... 295 ...
Page 311: ... 296 ...