
Chapter 15 Maintenance
181
Chapter 15
Maintenance
15.1
Inspection Items and Periods
Periodic inspections are required to maintain the robot in the best condition for a long
period of time. An inspector should prepare and execute an inspection plan.
The following items require periodic inspections. If you found some problems during
inspections, and you can resolve them on your own, contact Hanwha Precision
Machinery Co.
Inspection item
What to inspect
Periods
Robot
arm
All
Check if the robot moves to the desired
destination according to the program.
Daily
All
Remove stains, dusts and pollutants.
3 months
All
Check if the robot arm or tool sags when you
turn on/off the servo power.
Daily
Main
bolts
Check if the bolts exposed to the outside of
the robot is loose.
3 months
Motor
Check for abnormal heat generation or
noises.
Daily
Controller
Cable
Check the cable connections.
6 months
Internal
Remove dusts from the inside.
Filter
Remove dusts from the filter.
Summary of Contents for HCR-5
Page 1: ...HCR 5 Collaborative Robot User Manual Aug 2019 V 2 001 ...
Page 2: ......
Page 14: ......
Page 96: ...Chapter 8 Safety Settings 96 ...
Page 101: ...Chapter 8 Safety Settings 101 3 Press the OK button ...
Page 188: ...Chapter 15 Maintenance 188 4 When the confirmation window appears press YES ...
Page 192: ...192 Appendix B Certification Safety ...
Page 193: ...193 ...
Page 194: ...194 MD Machinery Directive ...
Page 195: ...195 LVD Low Voltage Directive ...
Page 196: ...196 EMC Electro Magnetic Compatibility ...
Page 197: ...197 Cleanroom Body ...
Page 198: ...198 Cleanroom Controller ...
Page 199: ...199 Appendix C Dimensions for Installation ...
Page 205: ......