RS5-34 Telescopic Handler
DOUBLE CHAIN REPLACEMENT
PRINTED IN U.S.A.
704-2
913241
Template Name: OML_2_col
907871
Template Date: 1994_04_22
Alt= to hide template information
Alt+ to display template information
STEP 7
G1616MP
Remove the clevis pin from the chain.
STEP 8
Remove both chains.
STEP 9
G1618MP
Remove the adjustment clevis from the old chain by
removing one cotter pin and the retainer pin.
STEP 10
G1619MP
Install the adjustment clevis on to the new chain
using the retainer pin and one cotter pin.
STEP 11
G1616MP
Position the chain in the clevis at the rear of the inner
boom section. Install the retainer pin.
STEP 12
G1617MP
Install the cotter pin in the chain retainer pin.
STEP 13
G1005055
Lay the double chain on top of the inner boom
section and stretch along the length of the inner
boom section with the clevis ends hanging over the
front of the boom nose.
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com