PRINTED IN U.S.A.
704-1
913241
Alt= to hide template information
Alt+ to display template information
Template Name: OML_2_col
907871
Template Date: 1994_04_22
RS5-34 Teleschopic Handler
DOUBLE CHAIN REPLACEMENT
DOUBLE CHAIN ROLLER
BEARING REMOVAL
STEP 1
With the engine running, retract the telescoping
boom and level it according to the boom angle
indicator, which should read “0”.
MANDATORY SAFETY SHUTDOWN
PROCEDURE
BEFORE cleaning, adjusting, lubricating, or
servicing this unit:
1. Stop machine on a level surface. (AVOID parking
on a slope, but if necessary, park across the
slope and block the tires.)
2. Fully retract the boom and lower the attachment
tool to the groun d. Id le en gi ne for gra dua l
cooling.
3. Place controls in neutral and apply parking
brake.
4. Shut off the engine and remove the key.
ONLY when you have taken these precautions
can you be sure it is safe to proceed. Failure to
follow the above procedure could lead to death or
serious personal injury.
STEP 2
G1635MP
Remove the four nuts that secure the clevises of the
double chain assembly to the outer boom. Hang both
chains over the front of the inner boom.
STEP 3
G0805199
Loosen and remove the four bolts (1) from the rear
cover (2) and remove the cover from the boom.
STEP 4
Relieve the hydraulic pressure and remove the
extend cylinder front pivot pin. See Section 608 in
this manual for correct procedure.
STEP 5
R e m o v e t h e i n n e r b o o m s e c t i o n f r o m t h e
intermediate boom section. See Section 703 in this
manual for correct procedure.
STEP 6
G1617MP
Remove one cotter pin from the clevis pin at the rear
of the inner boom.
1
2
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com