RS5/6-34 Telescopic Handler
HYDRAULICS
PRINTED IN U.S.A.
601-19
913241/BP0508
Alt= to hide template information
Alt+ to display template information
Template Name: OML_2_col
0-00000
Template Date: 1994_04_22
STEP 19
G0805085
Start the engine and lower the boom until the lift
cylinders are at the end of their stroke. shut off the
engine.
STEP 20
G0805187
Remove the pressure gauge from the lift cylinder.
Installt he inlet hose (1) of an in-line flowmeter to the
left hose and the outlet hose (2) of the flowmeter to
the cylinder left port.
STEP 21
G0805016
Open the load control valve of the flowmeter. Start
the engine and run at 1000 RPM.
STEP 22
G0805077
Move the joystick to the LOWER position and hold.
The pressure gauge should read 3000 psi (207 bar).
If the pressure is less than 3000 psi (207 bar)
proceed to Step 23.
If the pressure is more than 3000 psi (207 bar), follow
the procedure in the Main Control Valve Pressure
Relief Test and Adjustment section of this manual.
1
2
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com