RS5-34 Telescopic Handler
DOUBLE CHAIN REPLACEMENT
PRINTED IN U.S.A.
704-4
913241
Template Name: OML_2_col
907871
Template Date: 1994_04_22
Alt= to hide template information
Alt+ to display template information
DOUBLE CHAIN ROLLER
BEARING INSTALLATION
STEP 22
G1657MP
Remove the four nuts that secure the clevises of the
double chain assembly to the outer boom section.
Hang both chains over the front of the inner boom
section.
STEP 23
G1649MP
Loosen and remove the bolt (1) and nut (2) from the
front sheave pin.
STEP 24
G1648MP
Remove the sheave pin.
STEP 25
Remove the roller bearings.
STEP 26
G1646MP
The two roller beari ngs and sheave sho uld be
assembled before installing them. Press the roller
bearing (1) into the sheave (2). Apply grease to the
inside of the roller bearing, then insert the inner ring
(3) into the roller bearing.
1
2
3
1
2
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com