RS5-34 Telescopic Handler
BOOM ASSEMBLY
PRINTED IN U.S.A.
701-4
913241
Alt= to hide template information
Alt+ to display template information
Template Name: OML_2_col
907871E
Template Date: 1997_02_12
STEP 4
G1005026
Connect a second hoist to the lifting hook at the front
of the boom assembly. Apply upward pressure until
the chains are tight.
STEP 5
G1005033
G1005034
Mark the hydraulic hoses for correct assembly.
Di sco nn e ct th e fo ur hyd rau li c h o ses fro m th e
bulkhead.
STEP 6
Install caps and plugs tightly on all hydraulic hoses
and fittings to prevent contaminating the hydraulic
system.
STEP 7
G0805226
Remove the top pivot pin from both lift cylinders.
Complete Steps 5, 6 and 7 of Section 607 of this
manual for the correct procedure.
STEP 8
G0905008
Remove the top pivot pin from the slave cylinder.
Complete Steps 5, 6 and 7 of Section 606 of this
manual for the correct procedure.
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com