RS5-34 Telescopic Handler
SINGLE CHAIN REPLACEMENT
PRINTED IN U.S.A.
705-6
913241
Template Name: OML_2_col
907871
Template Date: 1994_04_22
Alt= to hide template information
Alt+ to display template information
STEP 32
G1659MP
Install the retainer bolt and nut through the pin and
tighten. Reposition the single chain over the sheave
pulley.
STEP 33
Reinstall the inner boom section, See Section 703 of
this manual for correct procedure.
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com