RS5/6-34 Telescopic Handler
HYDRAULICS
PRINTED IN U.S.A.
601-34
913241/BP0508
Alt= to hide template information
Alt+ to display template information
Template Name: OML_2_col
0-00000
Template Date: 1994_04_22
STEP 74
G0805120
Shut off the engine. Remove the cover from the tilt
right counterbalance valve.
NOTE:
The cover is friction fit and can be loosened
by twisting the cover on the valve cartridge.
STEP 75
G0805123
Loosen the lock nut (1) and turn the adjusting screw
(2) counterclockwise to increase and clockwise to
decrease the load check release pressure.
NOTE:
One turn of the adjusting screw can change
the pressure up to 500 psi (34 bar).
Hold the adjusting screw from turning and tighten the
lock nut. Repeat Steps 73 and 75 until the pressure
gauge reads 1500 psi (103 bar).
If the adjusting screw does not change the pressure,
replace the counterbalance valve.
If a new load counterbalance valve was installed,
repeat Steps 73 and 75 to set the load check release
pressure.
STEP 76
G0805120
Remove the pressure gauge (1) from the cylinder
and install the tilt right supply hose (2) to the cylinder
port (3). Install the cover on the load check valve (4).
STEP 77
G0805140
G0805125
Remove the supply hose (1) from the tilt left port (2)
of the frame leveling cylinder. Install the pressure
gauge (3) and hose between the cylinder port (2) and
the supply hose (1).
1
2
3
1
2
4
2
1
3
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com