GE H
EALTHCARE
D
IRECTION
GA091568, R
EVISION
5
VIVID E9 S
ERVICE
M
ANUAL
8 - 184
Section 8-7 - Replacing XYZ Parts
8-7-4-3
Z-Mechanism installation procedure
1.) Position the Z-Mechanism so the holes for the fixing screws align.
2.) Install two (2x) M6x16 Countersunk and two (2x) M6x16 screws.
3.) Install four (4x) M6x16 (lower part of unit).
4.) Install the XY (Frogleg) Mechanism.
5.) Install the Lower Frame Assembly.
6.) Install the Upper Frame Assembly.
7.) Install the Bulkhead Plate.
8.) Install the Bulkhead Board.
9.) Install the Operator Panel, Lower.
10.)Install the Operator Panel, Upper.
11.)Install the LCD Arm assembly.
12.)Install the LCD Monitor assembly.
13.)Install the LCD Rear Cover.
Summary of Contents for Vivid E9
Page 1: ...GE Healthcare OPERATING DOCUMENTATION VIVID E9 Service Manual Part Number GA091568 Revision 5...
Page 2: ......
Page 11: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL ix ZH CN KO...
Page 34: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL xxxii...
Page 800: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL Index 12...
Page 801: ......