GE H
EALTHCARE
D
IRECTION
GA091568, R
EVISION
5
VIVID E9 S
ERVICE
M
ANUAL
8 - 302
Section 8-13 - I/O Modules replacement
8-13-2-5
BEP5 I/O Board Assembly installation procedure
Follow these steps to install the BEP5 I/O Board Assembly:
1.) Guide the BEP5 I/O Board Assembly into the BEP frame.
2.) Be sure the three tabs on the end of the I/O fit into the three slots in the back of the BEP frame.
3.) Install the five screws connecting the I/O Board
to the BEP.
4.) Reconnect the cables inside the BEP to the I/O Board.
-
Flat cable from the Video (Graphics) board.
5.) Reconnect the I/O cabling.
6.) Install the BEP Cover as described in these steps:
a.) Insert the base of the BEP Cover inside the base of the BEP.
Be sure the bottom lip of the BEP Cover rests inside the BEP.
b.) Tilt the top of the BEP Cover toward the VIVID E9.
c.) Install the fixing screw(s) for the BEP Cover:
-
On newer BEP5 there are three Phillips screws, one on the top and one on each side of
the BEP Cover.
-
On older BEP5 there is one finger screw at the top of the BEP Cover.
7.) Install the Left Side Cover.
Figure 8-252 I/O board tabs
NOTICE
Be careful not to pinch any of the cables when installing the BEP Cover.
TABS
Summary of Contents for Vivid E9
Page 1: ...GE Healthcare OPERATING DOCUMENTATION VIVID E9 Service Manual Part Number GA091568 Revision 5...
Page 2: ......
Page 11: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL ix ZH CN KO...
Page 34: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL xxxii...
Page 800: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL Index 12...
Page 801: ......