GE H
EALTHCARE
D
IRECTION
GA091568, R
EVISION
5
VIVID E9 S
ERVICE
M
ANUAL
3 - 26
Section 3-7 - Completing the setup
3-7-7
Power On/Boot Up
3-7-7-1
Warnings
NOTE:
Do not cycle the Circuit Breaker ON-OFF-ON in less than five (5) seconds. When turning OFF
the Circuit Breaker, the system should de-energize completely before turning the circuit breaker
ON.
3-7-7-2
Power On / Boot Up - detailed procedure
For a detailed procedure, see:
4-2-1 "Power ON/Boot Up" on page 4-4
3-7-8
Power shut down
For a detailed procedure, see:
4-2-2 "Power shut down" on page 4-8
.
DANGER
ALWAYS CONNECT THE UNIT TO A FIXED POWER SOCKET WHICH HAS THE
PROTECTIVE GROUNDING CONNECTOR.
DANGER
NEVER USE A THREE-TO-TWO PRONG ADAPTER; THIS DEFEATS THE
SAFETY GROUND.
DANGER
ENSURE THAT THE POWER CORD AND PLUG ARE INTACT AND THAT THE
POWER PLUG IS THE PROPER HOSPITAL-GRADE TYPE (WHERE REQUIRED).
CAUTION
SYSTEM REQUIRES ALL COVERS
OPERATE THIS UNIT ONLY WHEN ALL BOARD COVERS AND FRAME PANELS ARE
SECURELY IN PLACE. THE COVERS ARE REQUIRED FOR SAFE OPERATION, GOOD SYSTEM
PERFORMANCE AND COOLING PURPOSES.
NOTICE
Use only power supply cords, cables and plugs provided by or designated by GE Healthcare.
Summary of Contents for Vivid E9
Page 1: ...GE Healthcare OPERATING DOCUMENTATION VIVID E9 Service Manual Part Number GA091568 Revision 5...
Page 2: ......
Page 11: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL ix ZH CN KO...
Page 34: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL xxxii...
Page 800: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL Index 12...
Page 801: ......