GE H
EALTHCARE
D
IRECTION
GA091568, R
EVISION
5
VIVID E9 S
ERVICE
M
ANUAL
Chapter 4 - General procedures and Functional checks
4 - 5
4-2-1-2
Connect AC (mains) Power to the VIVID E9
Connecting AC Power to the VIVID E9 ultrasound unit, involves preliminary checks of the power cord,
voltage level and compliance with electrical safety requirements.
1.) Ensure that the wall outlet is of appropriate type, and that the Circuit Breaker is turned off.
2.) Uncoil the power cable, allowing sufficient slack so that the unit can be moved slightly.
3.) Verify that the power cable is without any visible scratches or any sign of damage.
4.) Verify that the on-site mains voltage is within the limits indicated on the rating label near the Circuit
Breaker on the rear of the unit.
5.) Connect the Power Cable’s female plug to the Power Inlet at the rear of the unit.
6.) Lock the plug in position with the Retaining Clamp (ACC Clamp).
7.) Verify that the Mains Power Circuit Breaker is in OFF position, if not, switch it OFF.
8.) Connect the Power Cable’s other end (male plug) to a hospital grade mains power outlet with the
proper rated voltage, and the unit is ready for Power ON/Boot Up.
Figure 4-1 The Circuit Breaker and On/Off button
Summary of Contents for Vivid E9
Page 1: ...GE Healthcare OPERATING DOCUMENTATION VIVID E9 Service Manual Part Number GA091568 Revision 5...
Page 2: ......
Page 11: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL ix ZH CN KO...
Page 34: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL xxxii...
Page 800: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL Index 12...
Page 801: ......