
System Overview
2-7
2.2.
Subsystem
Power Distribution and Control
Interlock
In interlock loop, Interconnect Cable, Display Board, Collimator Control Board, Mainframe Control Board, Filament
Driver Board, KV Control Board and Power Distribution Unit Board compose a safety loop.
Once the interconnect cable between C-Arm and the Workstation is removed or any PCBs in C-Arm loose from
slot due to collision or other unexpected situation, the relay K4 (on Power Distribution Unit Board) will not be
energized so that the Mainframe can't be powered on. Workstation will boot up and just work in Review Station
status.
Power Distribution Unit Board
THEORY OF OPERATION
Power Supply Overview
The power of PDU board is driven by the main input power and the secondary side from main transformer
28VAC and 220VAC output.
Summary of Contents for Brivo OEC 715
Page 2: ......
Page 19: ...Chapter1 Introduction and Safety...
Page 41: ...Introduction and Safety 23 46 54 20 18 26...
Page 55: ...Chapter2 System Overview...
Page 137: ...Chapter3 Installation...
Page 212: ...Chapter4 Calibration...
Page 275: ...Brivo OEC 715 785 865 Mobile C Arm X Ray Product Service Manual 4 64...
Page 284: ...Chapter5 Software...
Page 326: ...Software 5 43 2 Click on install to continue 3 Click Next to continue...
Page 335: ...Chapter6 Troubleshooting...
Page 408: ...Chapter7 Replacement...
Page 418: ...Replacement 7 11 166...
Page 488: ...Chapter8 Periodic Maintenance...
Page 502: ...Periodic Maintenance 8 15...
Page 505: ...Chapter9 Technical Reference...
Page 521: ...Technical Reference 9 17 Vertical configuration 1 5m Vertical configuration 1m...
Page 526: ...11 Appendix System Schematics...