Installation
3-19
The system can adapt power supply of AC100V, AC110V, AC115V, AC120V, AC200V,
AC220V, AC230V and AC240V by different connections of the transformer. Before install
the system, please check the power supply voltage range and the transformer
connection
per the diagram below.
Wire
Transformer taps
Voltage
240 V
230 V
220 V
200V
120V
110V/115V
100V
Wire N (Brown)
1
1
1
1
1
1
1
Wire L1 (Blue)
5
4
4
3
5
4
3
Wire N1 (Black)
2
2
2
2
2
2
2
Wire L (Red)
8
8
7
6
8
7
6
Jumper
10-11
10-11
10-11
10-11
9-10
11-12
9-10
11-12
9-10
11-12
3.5.2.
UPS Setup
UPS is assembled in back of workstation. Considering safety of shipping, battery is not connected with
power supply.
Follow these steps to setup the UPS.
1.
Open the Power Distribution package.
2.
Release screws to fixe UPS. Then take out UPS.
Summary of Contents for Brivo OEC 715
Page 2: ......
Page 19: ...Chapter1 Introduction and Safety...
Page 41: ...Introduction and Safety 23 46 54 20 18 26...
Page 55: ...Chapter2 System Overview...
Page 137: ...Chapter3 Installation...
Page 212: ...Chapter4 Calibration...
Page 275: ...Brivo OEC 715 785 865 Mobile C Arm X Ray Product Service Manual 4 64...
Page 284: ...Chapter5 Software...
Page 326: ...Software 5 43 2 Click on install to continue 3 Click Next to continue...
Page 335: ...Chapter6 Troubleshooting...
Page 408: ...Chapter7 Replacement...
Page 418: ...Replacement 7 11 166...
Page 488: ...Chapter8 Periodic Maintenance...
Page 502: ...Periodic Maintenance 8 15...
Page 505: ...Chapter9 Technical Reference...
Page 521: ...Technical Reference 9 17 Vertical configuration 1 5m Vertical configuration 1m...
Page 526: ...11 Appendix System Schematics...