5-124
L60 LINE PHASE COMPARISON SYSTEM – INSTRUCTION MANUAL
SYSTEM SETUP
CHAPTER 5: SETTINGS
5
SWITCH 1 CLOSE
— This setting selects an operand that creates a programmable signal to operate a contact output to close
disconnect switch 1.
SWITCH 1 BLK CLOSE
— This setting selects an operand that prevents closing of the disconnect switch. This setting can be
used for select-before-operate functionality or to block operation from a panel switch or from SCADA.
SWTCH 1
Φ
A/3P CLSD
— This setting selects an operand, usually a contact input connected to a disconnect switch auxiliary
position tracking mechanism. This input is a normally-open 89/a status input to create a logic 1 when the disconnect
switch is closed. If the
SWITCH 1 MODE
setting is selected as
“
3-Pole,
”
this setting selects a single input as the operand used
to track the disconnect switch open or closed position. If the mode is selected as
“
1-Pole,
”
the input mentioned is used to
track phase A and the
SWITCH 1
Φ
B
and
SWITCH 1
Φ
C
settings select operands to track phases B and C, respectively.
SWTCH 1
Φ
A/3P OPND
— This setting selects an operand, usually a contact input, that is a normally-closed 89/b status input
to create a logic 1 when the disconnect switch is open. If a separate 89/b contact input is not available, then an inverted
89/a status signal can be used.
SWITCH 1
Φ
B CLOSED
— If the mode is selected as three-pole, this setting has no function. If the mode is selected as single-
pole, this input is used to track the disconnect switch phase B closed position as outlined for phase A.
SWITCH 1
Φ
B OPENED
— If the mode is selected as three-pole, this setting has no function. If the mode is selected as single-
pole, this input is used to track the disconnect switch phase B opened position as outlined for phase A.
SWITCH 1
Φ
C CLOSED
— If the mode is selected as three-pole, this setting has no function. If the mode is selected as single-
pole, this input is used to track the disconnect switch phase C closed position as outlined for phase A.
SWITCH 1
Φ
C OPENED
— If the mode is selected as three-pole, this setting has no function. If the mode is selected as single-
pole, this input is used to track the disconnect switch phase C opened position as outlined for phase A.
SWITCH 1 Toperate
— This setting specifies the required interval to overcome transient disagreement between the 89/a and
89/b auxiliary contacts during disconnect switch operation. If transient disagreement still exists after this time has expired,
the
SWITCH 1 BAD STATUS
FlexLogic operand is asserted from alarm or blocking purposes.
SWITCH 1 ALARM DELAY
— This setting specifies the delay interval during which a disagreement of status among the three-
pole position tracking operands do not declare a pole disagreement. This allows for non-simultaneous operation of the
poles.
NOTE
IEC 61850 functionality is permitted when the L60 is in “Programmed” mode and not in local control mode.