M6500 Series NE Configuration Manual
84
Figure5-40 Apply M6500-TMXP2 Board Mode
After successful application, the board is initialized, as shown in the figure below:
Figure5-41 M6500-TMXP2 Board Initialization
After a moment,NE synchronization is performed. The latest mode of M6500-TMXP2 board is synchronized.The
operation steps are as follows: select NE, and click and select "
NE Management
" on the right , then click
"
synchronization
" button on the right side of the NE synchronization module, the interface is as shown in the
figure below:
Figure5-42 NE Synchronization
After successful synchronization, it is successfully switched to the M6500-40G-TMXP2 board mode, as shown in
the figure below:
Summary of Contents for M6500 Series
Page 12: ...M6500 Series NE Configuration Manual 11 Figure 1 3 Start NMS Server...
Page 109: ...M6500 Series NE Configuration Manual 108 Figure6 5 TP Multiplexing Configuration Step 2...
Page 113: ...M6500 Series NE Configuration Manual 112 Figure6 12 Set Line Side PM Overhead...
Page 116: ...M6500 Series NE Configuration Manual 115 Figure6 16 Configure Line Side Port TTI...
Page 117: ...M6500 Series NE Configuration Manual 116 Figure6 17 Configure Client Side Local End Port TTI...
Page 129: ...M6500 Series NE Configuration Manual 128 Figure7 10 Select Protection Mode...