41
30. Reconnect the syrup lines and bags of
syrup by pressing the Syrup Bag Connector
onto the Syrup Bag Adapter valve.
26275
31. Install the Duckbill Check Valve into the
Syrup Line Manifold and the Syrup Line
Manifold into the Coupler Body.
26176
32. Remove the end of the 9-Tube Assembly
from the container. Spray end of the
assembly with approved sanitizer solution
and allow it to sanitize for at least 1 minute.
26177
33. Carefully align the pins of the Syrup Line
Manifold with the Syrup Line Connector and
insert the end of the 9-Tube Assembly fully
into the Coupler.
26178
34. Push the Coupler Nut into the Coupler Body
and rotate the Coupler Body until motion
stops to secure.
26179
35. Install the cap on the manifold.
26189
36. Perform the “Assembling the Blending
Assembly” and “Installing the Blending
System” sections of the DAILY OPENING
PROCEDURES.
37. Prime the syrup system as instructed in
“Priming the Syrup System.”
Summary of Contents for TS 80BLD
Page 4: ...3 PAGE INTENTIONALLY LEFT BLANK...
Page 7: ...6 General System Overview 1 3 7 9 8 6 4 5 26001 12 2 10 11 Figure 1...
Page 12: ...11 PAGE INTENTIONALLY LEFT BLANK...
Page 21: ...20 Spare Parts Kit 10 12 13 2 6 5 11 7 16 3 4 1 14 9 15 8 26007 Figure 7...