Once the lines have been cleaned up, remove the cleaning collector (or put back on the collector
brush in the case of double collectors), since this system is not designed to run over long distances (see
section on Cleaning collector).
MONITORING OF GROUND CONTINUITY
When one (or several) expansion joints are fitted, the ground continuity on each expansion joint
should be checked: once every two years
MAINTENANCE OF CIRCUIT INTERRUPTIONS
When one (or several) circuit interruptions are present, the insulation of the circuit interruption
elements should be checked by means of an insulation controller, at a voltage higher than the
rated voltage.
The insulation sectors should be cleaned, as necessary.
SPARE PARTS
Replacement Brush: 60A = MC0114 ; 200A = MC8041
Simple cleaning Brush: MC4190
17.GUARANTEE :
Our equipment is guaranteed one year against any material or manufacturing defect recognized by
ourselves. As we are not responsible for its installation and operation, our guarantee covers only
replacement or repair (at our own choosing) of the part recognized to be defective.
We do not accept responsibility for any defects arising from faulty supervision or maintenance. We
also disclaim liability for any production stoppages that may result. Any arbitration shall be held in
Strasbourg, even when several defendants are involved.