
4.1.5
Post
‐
Maintenance
Checklist
(After
any
intrusive
service
work)
CHECK
TASK
1.
The
unit
is
tilted
for
correct
condensate
drainage.
Ensure
the
back
of
the
unit
is
1”
higher
than
the
front
(approx.
4
shims).
2.
All
hoses
are
connected.
3.
All
electrical
cables
are
connected.
4.
No
loose
parts
or
tools
in
the
electrical
panels.
5.
All
panels
are
reinstalled.
6.
The
water
levels
in
the
SMU
and
the
WRS
are
both
at
the
HIGH
marks.
7.
The
jacket
vent
valve,
chamber
vent
valve,
and
both
drain
valves
are
closed
firmly.
8.
The
WRS
is
turned
ON.
9.
All
accessories
are
accounted
for
in
the
SAB
and
the
SAB
is
properly
stored.
10.
All
shelves
are
in
place.
11.
All
alarms,
repairs,
and
cycle
count
(found
in
“STATUS”
screen)
are
documented.
12.
During
a
cycle,
there
are
no
steam
leaks
or
water
leaks.
13.
Cycle
times
are
normal.
14.
Chamber
vents
correctly.
15.
Follow
all
applicable
requirements
in
AAMI
ST79
for
post
‐
maintenance
performance
qualification
(e.g.
IUSS
warmup,
Vacuum
Leak
Test,
three
successful
Bowie
Dick
Tests).
81
Summary of Contents for P2131
Page 121: ... THIS PAGE INTENTIONALLY LEFT BLANK 115 ...
Page 130: ...SECTION A APPENDIX 124 ...
Page 131: ...A 1 Swagelok Fitting Installation Instructions 125 ...
Page 135: ...A 2 PLC Data Sheet 129 ...
Page 141: ...A 3 VERIFY Product Information 135 ...
Page 147: ...A 4 WRS Pump Information 141 ...
Page 158: ...A 5 Vacuum Leak Test Troubleshooting Guide 152 ...