
4.1.3
6
‐
Month
Preventive
Maintenance
EVERY
6
MONTHS
OR
1300
CYCLES
(WHICHEVER
OCCURS
FIRST)
CHECK
TASK
1.
Replace
the
HEPA
filter
located
under
the
SMU
top
panel.
The
HEPA
filter
is
a
safeguard
against
contamination
during
vacuum
and
should
always
be
in
good
working
condition.
2.
Lightly
lubricate
the
chamber
doorpost
threads
using
high
temperature
(275°F)
NLGI
#2
grease.
3.
Inspect
inlet
air
filter
on
right
‐
hand
side
of
SMU.
If
dirty,
wash
and
reinstall.
4.
Inspect
air
filter
on
outlet
of
SMU
electrical
box
cooling
fan.
If
dirty,
wash
and
reinstall.
Remove
the
SMU
top
and
right
‐
hand
side
panel
to
access
this
filter.
5.
Inspect
the
heat
exchanger
in
the
WRS
and
clean
if
dirty.
6.
Apply
power
(120V/60Hz)
to
heat
exchanger
fan
in
WRS
and
ensure
that
it
is
functional.
NOTE:
Operation
of
this
fan
is
normally
hidden.
NOTE:
On
S/N’s
after
AFS
‐
0236,
there
is
a
single
fan
mounted
on
the
heat
exchanger
mounted
on
the
Back
Panel.
Operation
of
this
fan
can
be
observed
by
checking
for
air
flow
during
operation
of
the
Sterilizer.
7.
Inspect
wiring
in
SMU
and
WRS
electrical
boxes
for
loose
wires,
corrosion,
or
other
concerns.
8.
Ensure
jam
nuts
on
the
two
front
chamber
mounts
are
tight.
Also,
ensure
the
rear
chamber
mounting
bolts
are
tight.
9.
Ensure
adequate
replacement
parts
are
in
stock
to
ensure
your
mean
‐
time
‐
to
‐
repair
(MTTR)
objectives
can
be
met.
Reference
Section
4.4
and
order
parts
as
needed.
10.
Re
‐
torque
the
3
doorpost
screws
to
90
in
‐
lbs.
11.
Remove
Heater
Assembly
Cover
and
Heater
Block
Enclosure,
re
‐
torque
the
8
heater
plate
nuts
to
120
in
‐
lbs.
Inspect
3
heater
wires
before
reinstalling
the
Heater
Block
Enclosure
and
Heater
Assembly
Cover.
Reference
Section
4.3.17
to
remove
Heater
Assembly
Cover.
12.
Check
calibration
of
Handheld
TDS
Meter.
See
Section
3.4.1.
WARNING:
To
avoid
a
potential
electrical
shock
or
burn
hazard,
be
sure
the
sterilizer
has
been
de
‐
energized
and
depressurized
prior
to
performing
these
tasks.
76
Summary of Contents for P2131
Page 121: ... THIS PAGE INTENTIONALLY LEFT BLANK 115 ...
Page 130: ...SECTION A APPENDIX 124 ...
Page 131: ...A 1 Swagelok Fitting Installation Instructions 125 ...
Page 135: ...A 2 PLC Data Sheet 129 ...
Page 141: ...A 3 VERIFY Product Information 135 ...
Page 147: ...A 4 WRS Pump Information 141 ...
Page 158: ...A 5 Vacuum Leak Test Troubleshooting Guide 152 ...