
The
“Log”
screen
will
be
displayed
at
the
end
of
the
cycle
showing
the
results
of
the
cycle.
A
total
of
40
previous
“Log”
entries
can
be
viewed
using
the
LEFT
and
RIGHT
arrows.
The
“Log”
screen
can
also
be
accessed
from
the
“Main
Menu.”
3.3.4
RUNNING
A
PERFORMANCE
TEST:
1.
On
the
“Main
Menu”
screen,
choose
“TESTS”.
2.
On
the
“Performance
Tests”
screen,
choose
either
“BOWIE
‐
DICK
TEST”
or
“VACUUM
LEAK
TEST.”
For
a
BOWIE
‐
DICK
TEST:
Place
a
U.S.
Food
and
Drug
Administration
(FDA)
‐
approved
BOWIE
‐
DICK
test
pack
on
the
bottom
rack
near
the
drain
in
the
chamber.
Follow
all
test
pack
manufacturer’s
recommended
procedures.
For
example,
a
warmup
cycle
(e.g.,
IUSS
4/0)
should
always
be
run
prior
to
the
BOWIE
‐
DICK
test.
WARNING:
A
BOWIE
‐
DICK
test
should
be
performed
each
day
to
ensure
air
removal
is
functioning
properly
during
pre
‐
vac.
A
BOWIE
‐
DICK
test
should
also
be
performed
any
time
the
sterilizer
is
set
up
at
a
new
location
or
after
maintenance
work.
44
Summary of Contents for P2131
Page 121: ... THIS PAGE INTENTIONALLY LEFT BLANK 115 ...
Page 130: ...SECTION A APPENDIX 124 ...
Page 131: ...A 1 Swagelok Fitting Installation Instructions 125 ...
Page 135: ...A 2 PLC Data Sheet 129 ...
Page 141: ...A 3 VERIFY Product Information 135 ...
Page 147: ...A 4 WRS Pump Information 141 ...
Page 158: ...A 5 Vacuum Leak Test Troubleshooting Guide 152 ...