
ROUTINE
STARTUP
CHECKLIST
CHECK
OPERATION
1.
Remove
and
clean
the
chamber
drain
screen.
(Inspect
O
‐
ring
for
potential
damage
on
S/N’s
after
AFS
‐
0203.
Replace
with
spare
from
SAB
if
necessary).
2.
Ensure
chamber
and
jacket
vent
valves
are
closed.
3.
Flip
the
control
power
switch
to
the
“ON”
position.
4.
Fill
the
jacket
with
water
to
the
HIGH
mark
using
the
WRS.
NOTE:
Never
add
water
to
the
sterilizer
during
a
cycle.
This
will
cause
the
jacket
to
cool
off,
lose
pressure,
and
alarm.
5.
Ensure
the
water
level
in
the
WRS
is
at,
or
near,
the
HIGH
mark.
If
not,
add
water
using
the
SWS.
6.
Run
an
IUSS
cycle
to
warm
up
the
chamber.
NOTE:
It
is
critical
to
run
this
warmup
cycle
to
ensure
successful
completion
of
the
Bowie
‐
Dick
test.
7.
Run
a
Bowie
‐
Dick
test
per
AAMI
standards
to
ensure
that
air
removal
during
the
preconditioning
phase
is
functioning
properly.
8.
Proceed
with
a
normal
sterilization
cycle
as
needed.
WARNING:
Run
a
VACUUM
LEAK
TEST
on
a
periodic
basis
per
AAMI
standards
or
at
least
weekly
and
always
after
any
transport,
relocation,
or
maintenance.
If
the
VACUUM
LEAK
TEST
FAILS,
call
a
qualified
maintenance
technician
to
troubleshoot.
51
Summary of Contents for P2131
Page 121: ... THIS PAGE INTENTIONALLY LEFT BLANK 115 ...
Page 130: ...SECTION A APPENDIX 124 ...
Page 131: ...A 1 Swagelok Fitting Installation Instructions 125 ...
Page 135: ...A 2 PLC Data Sheet 129 ...
Page 141: ...A 3 VERIFY Product Information 135 ...
Page 147: ...A 4 WRS Pump Information 141 ...
Page 158: ...A 5 Vacuum Leak Test Troubleshooting Guide 152 ...