
4.
After
checking
the
water
level,
ensuring
the
chamber
vent
valve
is
closed,
and
tightening
the
door,
press
“START”
to
begin
the
cycle.
5.
At
the
end
of
the
cycle,
the
buzzer
will
sound
and
the
chamber
will
vent.
Once
the
chamber
is
completely
vented,
the
door
can
be
opened.
NOTE:
Unlocking
the
door
(which
actuates
the
door
switch)
before
the
chamber
reaches
0
psig
will
stop
the
venting
and
may
create
a
situation
in
which
the
door
may
not
open
due
to
vacuum
in
the
chamber.
If
this
happens,
lock
the
door
and
press
“VENT”
from
the
“Log”
screen.
The
“Log”
screen
will
be
displayed
at
the
end
of
the
cycle
showing
the
results
of
the
cycle.
A
total
of
40
previous
“Log”
entries
can
be
viewed
using
the
LEFT
and
RIGHT
arrows.
The
“Log”
screen
can
also
be
accessed
from
the
“Main
Menu.”
49
Summary of Contents for P2131
Page 121: ... THIS PAGE INTENTIONALLY LEFT BLANK 115 ...
Page 130: ...SECTION A APPENDIX 124 ...
Page 131: ...A 1 Swagelok Fitting Installation Instructions 125 ...
Page 135: ...A 2 PLC Data Sheet 129 ...
Page 141: ...A 3 VERIFY Product Information 135 ...
Page 147: ...A 4 WRS Pump Information 141 ...
Page 158: ...A 5 Vacuum Leak Test Troubleshooting Guide 152 ...